Water Dynamics supply rain water to local community football and netball clubs

Football_Case_Study

The Customer

East Gambier Football Club

Job Specifications

  • To supply rain water to the football and netball locker room showers and the club kitchen
  • Total water required when all taps running is 130L/m

Why the customer chose Water Dynamics?

Water Dynamics Mount Gambier have worked with the local community football club in the past, and therefore have a good relationship with sales staff by having come up with good solutions to solve their irrigation requirements.

Solution

A Grundfos CMBE 3-62 Twin variable speed pumping system was installed to meet the clients requirements.

Project Challenges

  • To maintain and supply a constant amount of water at a good pressure to run up to 12 showers and a kitchen tap at the peak period after the games have finished
  • To conserve power when less taps are being used
  • To utilize the rain water harvested off the club rooms roof

Project Outcome

Grundfos pump is operating as expected for the client

Latest Projects

Water Dynamics partnerships welcome a greener and stylishly sustainable historic main entrance to Darwin

The Stuart Highway entrance to Darwin is the dynamic northern terminus of this 2,720 km highway that is one of…

Read More...

Early adopter of citrus growing automation achieves cost-efficiency, connectivity, and conservation in the one package

  An Australian citrus grower at the forefront of automation efficiencies sweeping through the industry is increasing production quality and…

Read More...